
JThomas · CC BY-SA 2.0
An EICR is a report on the condition of an electrical installation after inspection and testing. It records what was examined, any agreed limitations and the findings. For a landlord, the useful outcome is knowing whether the installation is satisfactory and what needs doing next, rather than simply obtaining a document with a recent date.
It is different from an appliance check or a certificate for new electrical work. A folder containing several electrical documents can still be missing the report relevant to the property's current inspection duties.
What landlords in England need to arrange
For tenancies covered by the electrical safety regulations, a qualified person must inspect and test the installation at least every five years, or sooner if the report requires. Existing tenants must receive the report within 28 days; new tenants must receive it before occupation.
For a newly built or completely rewired home, the government's guidance allows an appropriate Electrical Installation Certificate to be supplied instead, with further checks normally due five years after its issue where the regulatory duties have been met. Do not assume that every change of tenant requires a fresh EICR when a valid report already exists.
Where the report requires remedial work or further investigation, it must be completed within 28 days, or within any shorter period specified. An immediate danger needs immediate action. The outer time limit is not permission to leave a dangerous installation in use while waiting for a convenient appointment.
The social-housing transition has now ended
The regulations extend to social rented homes. For social tenancies granted before 1 December 2025, the initial installation inspection and checks of landlord-provided electrical equipment had to be completed before 1 November 2026. At this article's review date, 1 November, that deadline has arrived: it is no longer an upcoming date to plan towards.
The transition did not extend private landlords' existing obligations. Nor does a five-year maximum inspection interval give a landlord another five years to carry out an overdue initial check. Confirm the requirements for the tenancy and use the report's actual next-inspection date for subsequent planning.
Read the observations, not just the front page
C1 means danger is present and immediate remedial action is required. C2 identifies a potentially dangerous condition requiring urgent action. FI means further investigation is required without delay. These findings make the report unsatisfactory. C3 is a recommendation for improvement and does not, on its own, make a report unsatisfactory.
Ask the inspector to explain the location and significance of each observation. A clear explanation should distinguish what needs addressing now from an improvement that can be considered separately. The report should give you a basis for decisions, not leave you trying to diagnose the installation from abbreviations.
Give the inspection enough room in the diary
Arrange access with the tenant and explain that testing may interrupt the electricity supply. Provide the previous report and records of subsequent work. Identify separate outbuildings, locked spaces and equipment that will be difficult to access before the appointment, so the scope can be agreed properly.
Allow time for the report to be issued and for findings to be dealt with. An inspection booked on the last available day leaves little flexibility if access fails or further investigation is needed. Ask how urgent observations will be communicated and when the written report will follow.
Keep the follow-up with the property record
Store the report and evidence of completed remedial work together against the correct address. Where an agent arranges the visit, establish who will receive the documents, send the required copies and follow up outstanding work. A contractor's appointment confirmation is not evidence that the inspection or remedial work has been completed.
For an EICR enquiry with Wallington Electrical Services, send the property location, the previous report if available and any relevant deadline. That gives us a practical starting point for agreeing access, inspection scope and the work needed after the findings are known.
