An unsatisfactory EICR gives you a list of findings to act on. Ask the inspector to explain what needs making safe straight away, what needs repairing and where further investigation is required. You can then arrange the right work and make sure it is recorded against the report. If you are dealing with a rented property in England, check the applicable deadline when you receive the report and arrange access promptly.
Establish what is safe to use now
If the inspector identified immediate danger, find out what was done before they left and what must stay out of use. A fitting or circuit may have been isolated. Make sure anyone at the property knows what that means for them and whom to contact. If the person commissioning the report is elsewhere, ask for a written summary they can pass on without guessing what the inspector meant.
Some observations describe a condition that needs repair. Others require investigation before the repair can be scoped. Ask which applies to each finding. It may be possible to quote for a clearly described replacement while setting aside a separate visit to trace an unknown fault. If access was limited during the first visit, ask what the investigator will need this time, such as keys, access behind a unit or contact with the person who occupies the property.
Ask for a scope you can compare with the report
Give the electrician the complete EICR, including the observations and test schedules. Ask them to reference the items their price covers and explain any assumptions. For example, “Investigate observation three and report what is found” describes a different commitment from “Repair the fault and provide the relevant test record”. Ask what will happen if the investigation reveals that the work is more extensive than first expected.
Decide separately whether to include any recommended improvements that are not required to resolve the unsatisfactory result. If you choose to do them while the electrician is already on site, ask for those items to be shown separately on the quote. That makes it easier to agree the work with an owner or agent and to explain which findings the resulting paperwork addresses.
Close the loop in writing
For properties covered by the English rented-sector electrical safety regulations, the government's guidance explains that required investigation or remedial work must be completed within 28 days of the inspection or within a shorter time specified in the report. It also sets out what written confirmation must be obtained and shared. Check the current guidance for the tenancy and who should receive the documents. Do not treat an invoice alone as confirmation that the regulatory steps have been completed.
Keep the original report, the written confirmation and any certificates or test results that relate to the work. Record the next inspection date separately. If the electrician has addressed some findings and is waiting for parts or a further appointment for another, record that openly. Ask whether the outstanding item affects what the tenant can use in the meantime. A clear record of the outstanding item and who is arranging it is more useful than filing the report as complete before every required step has been dealt with.
If your EICR recommends repairs or further investigation, send Wallington Electrical Services the full report and flag any dates your landlord or agent has given you. We can discuss the observations and what needs assessing before the scope and price are agreed.